
The mining facility is located within Europe’s largest data center campus, near a seaport with convenient transportation and logistics access. The site has a total power capacity of 200MW, and all facilities are ISO 27001 certified to ensure secure and efficient operations.

Ankr Mining’s mining facilities under development have a total load capacity exceeding 100MW, hosting mainstream Bitcoin and Ethereum mining equipment. The sites include both containerized mining farms.

The site is located in the Gobi Desert of Mongolia, where the year-round low temperatures provide an ideal environment for machine operation. The terrain is flat, with convenient logistics and secure storage facilities. A dedicated professional maintenance center is also in place.

The mining facility is located in Ciudad del Este, Paraguay, currently operating at 30MW, with an additional 3MW being added each month. All power is sourced from hydropower, ensuring stable and environmentally friendly operations.

Our site has a total load capacity exceeding 80,000 kW, making it one of the largest, most stable, and most secure data center campuses in Europe. A flexible data center design, combined with ISO 27001 certification, ensures the reliability of our infrastructure and strong physical security.

Direct supply from the national power grid, with low policy risk. Investors may choose to build independently or through joint ventures; specific plans can be discussed. Open to co-development, hosting, and investment partnerships. all procedures can be completed within 1–2 months.